United Technologies Climate Controls & Security Center
Whiting-Turner
Palm Beach Gardens, FL
2016
United Technologies CIB consists of two 6 story cast in place concrete buildings connected by a steel-framed structure. United Forming provided a turnkey concrete construction package to Whiting-Turner during the construction of the 182,643 square foot project.
Approximately 13,000 cubic yards of concrete, 1200 tons of reinforcing steel, and 112,000 lbs of post-tensioning material was required to complete the project.