Forming Systems

Our scope of work for this project includes precast parking deck cast-in-place walls, one (1) elevated podium slab for the Liner Building and one (1) elevated podium slab, 24" thick, and an average of 20+ feet tall, for the Tower Structure. The big podium slab for the Tower supports a 12 story Precient system tower. Thanks to the great team at Balfour Beatty US for the opportunity!
This project has seven (7) elevated slabs and a total of 118,000sf. This is the second project we are doing as part of the Gateway Development at the Atlanta Airport with our great partners at Batson-Cook Construction.
This project consists of a four (4) level, 210,000sf, cast-in-place podium structure supporting an eight (8) level, Infinity Structural System, with Epicore composite floors. Our scope of work also includes cast-in-place shearwalls that go all the way up through the tower to the roof. Another great opportunity with the great folks at Brasfield & Gorrie, LLC.
This project is 17 Levels, approximately 360,500sf. This tower is the final major piece of the Camperdown Development in Greenville. We are proud to be working with our great partners at Brasfield & Gorrie on this exciting project.
Village Park at Wills Road is a senior living development. This project includes five (5) levels of cast-in-place slabs and is approximately 177,000sf. We partnered up with Greater Georgia Concrete, LLC and look forward to developing a great new partnership and many more projects to come!
Our scope of work for Juniper & 5th Condos project includes a two level podium structure, with approximately 127,000sf of elevated cast-in-place slabs. We appreciate the opportunity with J.M. Wilkerson Construction for a great project!
As part of the Love Field Modernization Program, Parking Garage C provides approximately 5,000 spaces over nine levels of parking. Partnered with Hensel Phelps, we provided formwork services for over 1.8 million square feet of elevated concrete construction.
The project is a residential building on top of a parking structure and consists of 108,000sf of elevated cast-in-place slabs. We appreciate the opportunity to work with Thomas and look forward to a successful project.
We are excited to be working with Batson-Cook Construction on another great project! The project is a 51,000-square-foot, two-story office building on top of two story, +/- 135 parking deck.
This project is a 32 story hotel and condo located in Austin, TX. We are working with our wonderful partners at Austin Commercial and are very excited about another very successful project.
This is a seven story mixed-use parking garage, which consists of 280,000 SF of both parking and retail space. United Forming continues to work safely and productively and looks forward to another successful project with Balfour Beatty US.
The Structure has 21 elevated levels and is approximately 485,000 sf.
The Structure has 16 elevated levels and is approximately 881,100 sf. We are excited about getting started on another project with Brasfield & Gorrie, LLC and appreciate the opportunity to work with such great team!
The new Kinder High School for the Performing and Visual Arts replaces, upgrades and expands the existing HSPVA. We provided formwork services for over 260,000 square feet of parking, classroom, theater, and administration area construction.